Café Consulting — guides and answers
Turning a coffee dream into a plan a bank, a landlord and a café owner can all read.
What is a café concept, and how do you develop one?
A café concept is the promise, the customer and the price band in one line. Here is how to develop one that fits the site, the budget and the team you actually hire.
How do you work out whether a café location can carry its rent?
Work out if a café site can carry its rent by converting the rent into the orders you must sell each day, then testing that number against capacity and real footfall.
What should a café feasibility study actually look at?
A café feasibility study looks at footfall, rent, competition, demand by daypart, licences and the numbers. Here is the list that matters and the order to work it in.
How do you build a costed profit and loss projection for a café?
Build a café profit and loss projection by separating fixed and variable costs, projecting orders and average ticket month by month, and testing it on a slower month.
What should a café floor plan get right before you draw it?
Before you draw a café floor plan, settle the counter length, the queue route, the seating ratio and the wet areas. Get these right and the drawing follows.
How do you plan a café workflow so the queue keeps moving?
Plan café workflow by mapping order to handover, removing steps from the barista's path, and adding capacity where the queue actually forms. Speed is a design decision.
How do you calculate the labour cost of running a café?
Calculate café labour cost by staffing to peak-hour volume, counting every paid hour including setup, and adding statutory costs before you compare it to revenue.
What equipment list does a new café actually need?
The equipment list for a new café runs from the espresso machine and grinder to brewer, blender, ice and storage — sized to menu and volume, not to showroom spec sheets.
How do you compare two espresso machine quotes fairly?
Compare espresso machine quotes on groups, capacity, build, warranty, service reach, spares and installed cost — not on the headline price or the shiny spec sheet.
What should be in a café pre-launch checklist?
A café pre-launch checklist covers licences, utilities, equipment, stock, training, systems and the rehearsal — so nothing is discovered in the first trading week.
How do you run a soft opening before a café fully opens?
Run a café soft opening as a controlled rehearsal: a limited menu, invited guests, real service under pressure, and a fix list built from what the shift actually showed.
When does it make sense to consult a café consultant?
Bring in a café consultant when the decision is expensive to reverse, the numbers are contested, or the team needs an outside standard. Here is when it pays.