How much do consulting and training cost?
We quote before the work starts, in writing, with the deliverables listed, so you can compare two offers on the same terms. Consulting, training and menu work are scoped separately because they are different jobs, and the scope matters more than a headline number.
If you want a figure to plan with, the honest answer is that the cost tracks the size of the job and the time it takes, and the first step is a paid discovery session whose scope you can read before you commit to anything larger. We would rather quote a real number for real work than publish a price list that does not describe it.
Key takeaways
- Everything is quoted in writing before work begins.
- Scope and deliverables are part of the quote.
- Discovery comes first, so the big number is informed.
- No percentage-of-sales model on the first project.
How a consulting quote is built
A consulting quote covers the scope of the engagement, the number of site visits, the documents delivered and the timeline. A full concept and pre-launch package is a larger job than a menu and staffing review, and it is priced accordingly. We do not quote a per-hour rate and leave you to guess the hours, because that is how budgets go wrong.
How training is priced
Training is priced by format and group size. A barista workshop with eight people costs less per person than the same workshop with three, because the machine time, the tasting and the corrections scale with the group. On-site team training adds the travel and the scheduling around your service hours.
What is not included
Physical costs — equipment purchases, build-out, rent deposits, licensing fees and stock — are paid by you directly to the supplier or the authority, never through us. Any third-party cost we help you evaluate is listed in the quote as an estimate, and we tell you when a figure is a current rate you must check yourself. Nothing is marked up and nothing is marked down.
Questions people ask
Do you work on a percentage of sales?
No for the initial project. It couples our fee to the month's trading, which makes the advice conservative in a way that helps neither side. Ongoing implementation work can be arranged as a monthly retainer, agreed separately and with a written scope.
What if I only need one thing done?
That is a normal request and it is priced as a single piece of work. A menu costing review, a one-day team training session, or a supplier comparison can each stand alone without the rest of the programme.
How do I get a number for my project?
Send the details of your café or idea — the location, the floor size, the current equipment and the problem you want solved — and you will get back a written scope, a number, and a plain answer if the problem is one you can solve yourself with a checklist.
What if the engagement does not achieve what I expected?
The first session is where we test whether we are the right people for the problem, and it is scoped so you can stop there. Every quote states the deliverables, so a shortfall against the written scope is a contractual question, not an argument about what was meant.