KAI — consultations, coffeeKAI

What should a café opening checklist contain?

An opening checklist is a fixed sequence of checks that takesthe café from locked to service-ready: machine and grinderchecks, water and milk quality, stock levels, cash float,cleaning left over from the previous night, and a handovernote from the night shift.

Write it as a checklist with tick boxes, not as prose, andkeep it to what must be true before the first customerarrives. Items that can wait until after opening belong on aseparate mid-shift list, otherwise the checklist grows toolong to finish on time.

Key takeaways

  • Tick boxes beat paragraphs
  • Service-ready means machine, water, milk, cash
  • Separate pre-open tasks from mid-shift tasks
  • One page, one shift, one owner

What the list must cover

Break the checklist into five blocks: the machine andgrinder, water and milk, stock, cash and payments, and thecleaning left over from yesterday. Each block gets two tofive items with a pass condition, such as burrs clean and adial-in shot tasted, so a new barista knows what doneactually looks like.

Writing it so it gets used

Put the checklist where the shift starts, not in a folder.Assign one named person per shift to complete it and anotherto verify, sign both names, and keep the completed sheets fora month. A checklist nobody signs is a piece of paper, and achecklist that takes twenty minutes is one that gets skipped.

What to leave out

Exclude anything that does not change the quality of theshift: decorative tasks, log-filling that adds nothing, andanything written to fill space. Also separate what must bedone before opening from what must be done during the day.Confusing the two is how a fifteen-minute checklist becomes aforty-minute one.

Questions people ask

How long should an opening routine take?

Aim for fifteen to twenty minutes for a single-machine caféand up to thirty-five for a larger floor with espresso, brewand a food pass. Time it on a real shift, not an empty one.If it regularly overruns, the problem is usually that thelist contains closing tasks.

Who should complete the opening checklist?

The first person on shift completes it and the secondverifies. For solo operators, self-verification works only ifyou record something objective, such as a photo of thedial-in shot or the recorded grinder setting, rather than atick that proves nothing at all.

What if the café is opened for the first time?

On the first morning, walk the whole sequence with the personwho will run it, and do not shorten it for speed. The openingroutine teaches the order of operations: if the water systemis flushed after the first shot is pulled, the customer getsthe fault, not the technician.

Should the checklist be printed or on a screen?

Printed, laminated, at the bar, for the daily list. A screenworks well for the weekly stock and maintenance checks, but aroutine that depends on a phone or a shared tablet will failthe first time the device is dead or the queue is long.