KAI — consultations, coffeeKAI

What should be in a café pre-launch checklist?

A pre-launch checklist exists to catch the things that are cheap to fix before opening and expensive to fix after: a water line that arrives dirty, an FSSAI registration you have not applied for, a menu priced before the supplier's invoice, and a team that has never closed the shop together.

Organise it by owner and by week, not by department. Every item needs a name against it and a date. If the checklist has no owner, it is a wish list. If it has no date, it will be done on the morning of opening, and that is when a café opens with no gas connection and no printed menu.

Key takeaways

  • Give every item an owner and a date
  • Start licences and utilities weeks ahead
  • Price the menu from the real invoice
  • Practise a full shift before you trade

Licences, utilities and the site

Confirm the FSSAI registration or licence appropriate to your setup, the local trade licence, fire and pollution clearances where they apply, and the GST registration and invoicing setup you will trade on. On the building, test the water, the power load, the drainage, the ventilation and the air conditioning before the fit-out is closed up.

Equipment, stock and systems

Commission every machine with a supplier present and your team operating it. Count the stock against the opening order list, with the real invoice prices, and confirm delivery dates for the items with long lead times. Then set up the systems: the recipe file, the shift checklist, the opening and closing routines, the POS and the daily numbers sheet.

Training and the rehearsal

Train on your own machine, your own menu and your own floor, including the awkward parts: complaints, a wrong order, a failed shot, a customer who waits. Then run a full shift as a rehearsal with the whole team, timed, and fix whatever the rehearsal exposes while it is still a rehearsal.

Questions people ask

How far ahead should I start the pre-launch checklist?

Start with licences and utilities, because approvals and service connections take the longest and everything else depends on them. Work backwards from your opening date and put licences, fit-out, equipment delivery and training blocks on one sheet with their lead times. Owners who start with signage run out of time for what matters.

What should I order for the first week of stock?

Order to the opening menu, with a small buffer on fast-moving items and a short life on slow ones. Beans and milk should arrive in a cadence that matches consumption, not one large delivery. Check the shelf life of perishable items and plan the first spoilage before it happens.

Do I need a printed menu before opening?

For a counter board, a printed menu is useful but a temporary board is fine if it is accurate. For takeaway, have the printed sheets ready, because customers photograph them and share them, and an inaccurate board becomes a wrong order every time. Check the prices against the POS once.